Community Beta — help us catch confusing or incorrect solar recommendations.
One project, different audiences

Download the report that matches the conversation.

Every report uses the same project stored in your browser. No account or cloud upload is required.

1
Review the recommendationMake sure the system size and battery choice match the goal.
2
Review the build phasesChange the order, starter size and planning allowances first.
3
Choose the audienceDownload a homeowner, technical or installer handoff report.
Technical report

Inputs and coordination report

Detailed assumptions, PV string values, conductors, protection selections, roof model, and engineering review items.

  • Formula inputs
  • String and equipment coordination
  • AC/DC conductor selections
  • Safety review checklist
Installer handoff

Project handoff package

A structured scope summary for discussing the project with an installer, supplier, or electrician.

  • Project requirements
  • Equipment schedule
  • Open verification items
  • Exclusions and qualifications
Project portability

Share the inputs without creating an account.

Open Your Solar Plan at the bottom-right to copy a share link or export a .solarlab project file.

Review the full design